Products / KPRO Façades & Mortars / KPRO Floor LevelEase 110
Product Use:
Ensure the supporting concrete base/screed is stable, sound and free from any dust, dirt or grease.
The supporting base should then be primed using a suitable acrylic or water-based primer prior to application. Before installing KPRO Floor LevelEase 110, ensure that concrete, sand-cement, and calcium sulphate screeds are at least 28 days old and have dried sufficiently.
Benefits:
Download information on our ways of working and details on the products we offer.