Kilsaran played a key role in delivering the Marshalls Yard development at East Road, Dublin, a major residential scheme in the North Docklands comprising 554 apartments across nine buildings. Faced with a fast-paced programme and a constrained city-centre site, the project required efficient construction methods, careful logistics, and minimal disruption.

Kilsaran provided a fully integrated solution across multiple business units. Their Precast team delivered a Cross-Wall system to accelerate construction and reduce risk, while over 30,500m³ of Ready-Mix Concrete was supplied using electric trucks to support sustainability goals. Additional materials included concrete blocks and trowel-ready mortar.

Further enhancing the development, KPRO delivered External Wall Insulation and streetscape elements, while award-winning ClimaGrid permeable paving improved drainage and environmental performance.

This coordinated approach ensured a high-quality, efficient delivery and reinforced Kilsaran’s strong partnership with Bennett Construction on complex, large-scale projects.

Masthead image

Kilsaran was appointed by Duggan Brothers to supply materials for St. Vincent’s Community Nursing Unit in Mountmellick, Co.Laois. The project focused on enhancing thermal performance and long term durability, with Kilsaran’s EWI system selected as the primary facede solution, delivering excellent insulation, weather protection and a clean, modern finish. 

Kilsaran’s KPRO range supported façade, bonding and priming requirements, with Ceresit CT174 render in Phuket 6 and Nebraska 2 completing the external finish. Ready-mix concrete and high-quality concrete blocks were also supplied, providing a strong, durable structural foundation that met all modern construction standards. 

Masthead image

Kilsaran was selected for the RCSI Education and Research Building due to our proven ability to deliver high‑performance concrete solutions for complex, design‑led projects. The brief demanded exceptional consistency, durability, and aesthetic quality—particularly for the exposed structural elements, sculptural columns, and polished floor finishes featured throughout the building.

Our ready‑mix concrete and concrete blocks were chosen for their reliability, structural strength, and suitability for precision‑formed architectural features. Kilsaran’s technical team worked closely with the project stakeholders to ensure each mix met the exact requirements for finish, workability, and long‑term performance. For signature elements such as the polished flooring on Level 2, Kilsaran developed a bespoke mix incorporating crushed gravel to achieve a clean, reflective, premium finish.

From stringent quality control to tailored mix design and on‑site technical support, Kilsaran’s commitment to innovation and craftsmanship made us the trusted choice for a project where concrete plays a central architectural and structural role.

 Region: Leinster

Sector: Educational 

Products Used: 

Ready Mix Concrete

Location: Royal College of Surgeons, Co. Dublin 

Year of Completion: 2025

Masthead image

Ruxton Oaks 

Location: Blackcastle Navan, Co. Meath

Region: Leinster

Sector: Residential 

Products Used:

SMA 10 PMB Surface Course

AC20 Binder Course

Masthead image

Ushers Glen

Location: Ashford, Co. Wicklow

Region: Leinster 

Sector: Residential

Products Used:

SMA 10 PMB Surface Course

HRA with Red Chip Surface Course 

AC20 Binder Course

Masthead image

Barnhall Meadows

Location: Leixlip, Co. Kildare

Region: Leinster

Sector: Residential 

Products Used: 

SMA 14 PMB Surface Course

SMA 10 PMB Surface Course

AC20 Binder Course

Masthead image

White Stacks is a contemporary home on Killiney Hill that reinterprets the traditional Irish tower house, using concrete as its defining material to anchor the building within its dramatic coastal setting. Exposed concrete is expressed throughout—from striking entrance columns to interior slabs, screeds, and bespoke details—creating a refined balance between structural strength and natural warmth.

Region: Leinster

Sector: Residential

Products Used: Ready mix concrete

Location: Killiney, Co. Dublin 

Year of Completion: 2025

Photographer: Gareth Byrne Photography

Masthead image

The Academic Hub at TU Dublin’s Grangegorman Campus is a landmark, light-filled building that integrates the protected North House and annex, with exposed concrete forming a key architectural feature. Benchmark concrete samples were poured in June 2022, with the design team agreeing to a consistent mix incorporating 30% GGBS cement replacement to ensure high-quality, uniform exposed concrete throughout the project.

Masthead image

Cushaling Wind Farm is a landmark renewable energy project delivered on challenging cutaway peat bog terrain, requiring precise engineering and careful logistics. Kilsaran supplied approximately 10,700 m³ of concrete for the turbine foundations, supporting nine Vestas turbines that generate clean power for tens of thousands of homes. The project achieved a verified 63% reduction in embodied carbon, setting a benchmark for sustainable infrastructure delivery.

Location: Leinster

Sector: Infrastructure

Products Used:

Ready-Mix Concrete 

Year of Completion: 2024

Masthead image

The redevelopment of O’ Carolan College in Co. Meath delivered a modern, future-focused secondary school designed to support generations of students. Kilsaran Precast provided a complete precast structural solution, alongside ready-mix concrete, blocks, aggregates and mortar, with walls manufactured to be paint-ready internally and insulation-ready externally. A Just-in-Time delivery approach ensured efficient installation, supporting the project’s fast-track programme and sustainable construction objectives.

Masthead image

Kilsaran was appointed by Walls Construction in early 2023 to supply concrete for Marlet Property Group’s seaside residential development in Howth, Co. Dublin, delivering 596 high-end apartments opposite Howth Castle. Despite the logistical challenges of a single access route, over 47,000m³ of concrete was supplied across 5,000 deliveries using a consistent 45N S3 mix with clinker replacement, along with more than 1,000 metres of concrete paving, with the project completed in 2025.

Masthead image

Kilsaran Precast collaborated early with John Paul Construction to deliver a precast cross-wall solution for the Sandyford Central Residential Development, a 564-apartment, six-block scheme completed in 2023 for Richmond Homes. The system incorporated twin and solid walls, precast columns and beams, hollowcore flooring and stairs, with twin walls providing a paint-ready finish and integrated services.

Off-site precast construction accelerated the programme by approximately six months while improving buildability, safety and sustainability. Kilsaran also supplied a range of paving products to deliver a durable, consistent finish across the external area